Before the bubble film machine works, it must be checked to ensure the safety of the work. Now let's take a look at the check work of the bubble film machine?
1. Check whether the high-pressure air source, low-pressure air source, power supply and water source of the film blowing machine are under normal operation.
2. Before production, the bubble film machine shall be inspected and lubricated. Check whether the moving parts are firm in quality, whether the screws can be loosened, especially in the central part with strong impact, and whether the belt drive is abnormal locally.
3. The mold of the film blowing machine must be taken seriously, and the operator must not neglect it. Clean the mold regularly, and then polish the mold. The operator shall pay attention to the slow action when opening the up and down pressure air source switch, and shall not be too fast to avoid the air source flowing too fast and the dirt blowing into the solenoid valve. At the same time, open the exhaust valve for 30 seconds to ensure that the air is clean.
4. Check whether the lamp tube of the high-speed film blowing machine is damaged or broken. If there is a problem, the inspector shall change it at the first time.
5. Check whether the heating head of the film blowing machine can work normally when entering the embryo and dropping the embryo.
The above is the inspection work of the bubble film machine.




